Shelter for the location
The size, seating, glazing and orientation of the shelter should reflect the site and its prevailing conditions. Discuss passenger numbers, visibility and access with our team when planning the layout.
The Tilbury project
At Tilbury, the passenger shelter was installed on a floating pontoon connected to the shore by a bailey bridge. The bridge could not support the delivery lorry, so specialist equipment was needed to move the shelter into position.
Littlethorpe worked with Thurrock Council and the Port of Tilbury. The design incorporated Georgian details requested by the client, with heritage approval required for the listed pontoon.
Planning delivery and installation
Access to a terminal can be as important as the structure itself. Share the site's constraints early so that design, transport and installation can be considered together. Contact the team to discuss projects outside the UK and the arrangements that may be possible.
